COMPLETED HFO SYSTEM SHIPMENT FOR THE POWER PLANT Project Address : Located on the Indus rives 40km downstream of the town of chilas and 82km upstream of the town of DASU, Pakistan. EQUIPMENT LIST: 1.HFO BOOSTER UNIT 2. HFO PUMP UNIT 3.HFO CONDITIONING UNIT 4.HFO SEPARATOR UNIT 5.LUBE OIL SEPARATOR ... Read More
|
![]() |
SUDAN AUTOMATIC FUEL OIL PURIFICATION SYSTEM 1. APPLICATION: TURBINE 2. #316 STAIN LESS STEEL 3. CAPACITY: 8000L/H 4. STANDARD: ATEX Read More
|
![]() |
The auxiliaries system 1. Steam boiler 2. Silencer for the engines 3. HFO and DO separator and booster system 4. Electrical control system Read More
|
![]() |
1. Genset workshop 2. Air cooling tower for engines Read More
|
![]() |
|
![]() |
BANGLADESH 150MW HFO POWER PLANT-HFO SYSTEM THE SCOPE OF SUPPLY 1.HFO BOOSTER UNIT 23SETS 2.HFO SEPARATOR UNIT 10SET 3.LUBE OIL SEPARATOR UNIT 23SETS 4.GAS BOILER SYSTEM 10SETS 5.EXHAUST GAS SYSTEM 23SETS Read More
|
![]() |
FUEL OIL PURIFICATION MODULE 1. MAURITANIA 2. AUTO CONTROL 3. HEAVY FUEL OIL 4. 8000L/H 5. Export qty: 9sets Read More
|
![]() |
|
![]() |
PROJECT: IRAQ SAMAWA 50MW HFO POWER PLANT PROJECT DESIGNING :3MONTHS PROJECT ENGINEERING PERIOD:6MONTHS PROJECT ENGINEERING CONTENT: ALL EQUIPMENT INSTALLATION / COMMISSIONING Read More
|
![]() |
WASTE OIL PURIFICATION SYSTEM 1.SOUTH ARICA 2.WASTE OIL 3.CAPACITY:5000L/H 4.QTY:6SETS Read More
|